Originally, the Jai Hind metro station was planned to generally be elevated. Nevertheless, the AAI objected the elevated extend up towards the airport might pose a threat to aircraft, Hence the route was further more reworked and also the station was shifted underground, a hundred and fifty m through the Airport https://railway-kolkata36712.like-blogs.com/32110235/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf