In spite of the disclaimer, the Idaho Supreme Court docket held that the subcontractor had encountered site conditions differing from those indicated during the deal documents and that could not be seen through an affordable pre-bid site inspection. The subcontractor was awarded additional compensation.[five] Contractor encounters floor conditions or man-manufactured https://brooks22036.timeblog.net/68402140/indicators-on-conditional-meeting-you-should-know